The catalytic converter assembly in the exhaust pipe utilizes a three-way catalyst system that converts harmful exhaust gases, such as carbon monoxide, hydrocarbons, and nitrogen oxides, into less harmful compounds, such as carbon dioxide, water vapor, and nitrogen gas. This reduces the vehicle's impact on the environment and ensures compliance with emission regulations.
The exhaust pipe is designed for easy installation and is custom-made to fit perfectly into the Suzuki Liana series. The high-quality materials used in its manufacture ensure durability and longevity, ensuring that it performs optimally for an extended period. The exhaust pipe's design also enhances the vehicle's performance by improving exhaust flow, reducing backpressure, and increasing horsepower and torque.
Overall, the customized wholesale supply three-way catalytic assembly catalytic converter exhaust pipe for Suzuki Liana series is an ideal upgrade for anyone looking to improve their vehicle's performance and reduce its impact on the environment.
Carfitment | ||||
OE NO. | Car Fitment: | Mold | Year: | |
- | SUZUKI Liana | - | 2004-2007, 2005-2007, 2005-2016, 2001-2007, 2002-2007, 2002-2016, 2004-2016 | |
Product name | SUZUKI Liana | |||
Model Number | DJN548 | |||
Brand Name | DJN | |||
Emission Standard: | EURO 2/3/4/5 | |||
Material | Inside : ceramic(honeycomb) substrate 400cpsi with mat | |||
Shell :304 or 409 # stainless steel shell,stainless steel pipe | ||||
Oxygen sensor ports | Yes | |||
cpsi | 400 /600/800 | |||
Wall thickness | 0.09±0.025 | |||
Warranty | 30000 miles performance/2 years | |||
Packaging: | Air bubble film and Carton Packing | |||
MOQ: | 50 pcs | |||
Supply Ability | 1000 Piece/Pieces per Week | |||
Place of Origin: | Jiangsu | |||
SAMPLE ORDER: | Accept | |||
Condition | new | |||
Function | reduce harmful emission (CO,HC,NO) from motor vehicle Over 95% conversion efficiency; | |||
Service | Customers' specific demands available, design drawings are welcomed. OEM service is accepted | |||
Supply Ability | 1000 Piece/Pieces per Month | |||
Packaging & delivery | Air bubble film and Carton Packing, inside fix the product decently with expanded material | |||
Port | Shanghai/Ningbo | |||
Lead time: | 10-30 days . | |||
Active catalyst ingredients | Pt, Pd, Rh, and rare earth elements | |||
Shape | round, oval, race track |